Combined cycle power plant in Mary
Project duration
July 2015 - present
Customer
ARKAS LOJISTIK AŞ
TRANSPORTED CARGO
Lifting machinery and equipment
MAIN TRANSPORT
Auto
Railway
POL
POD
Turkey
Turkmenistan
Services
terminal handling operations at Turkmenbashy port;
transit customs formalities;
cargo delivery from Turkmenbashy port up to Mary by railway transporters / standard & low-bed trailers;
obtaining of traffic permits for OOG cargo transportation;
cargo escort;
Preparation and approval of loading/lashing schemes of OOG cargo via railway;
transportation of OOG cargo within the construction site of consignee;
installation / dismantling of road obstacles;
project description
The newly launched construction project of combined cycle power plant, with the capacity of 1574 MWt in Mary power station is designed with the goal of improving electricity supply of thriving industry of Turkmenistan as well as expanding of power export. The present innovative project of our country is realized by “Calik Enerji” company.

The station, designed to produce 12.6 billion kWt/h of electricity, belongs to the engineering development of the next generation. Unlike the other energy stations of Turkmenistan, this project will utilize steam along with natural gas as a fuel for electricity production.

Therefore, 4 gas and 2 steam turbines of "General Electric" will be installed in this project. As a result, the performance factor of power station increases more than one and half times. Besides that, consumption of natural gas used as fuel efficiently decreases. Gas-steam power plants do not have only economic benefits but also the environmental advantages, as the emission of combustion gas reduces in 2-3 times.